September imports remain strong as delays limit available space

September arrivals are holding up better than expected, even as some indicators of new demand soften. Delayed cargo, uneven departures and rising inland costs explain why importers are still feeling pressure.

Retailers now forecast September as the busiest arrival month at the US ports they track. Storm-delayed cargo is arriving alongside industrial and replenishment orders, extending the peak without establishing a stronger holiday selling season. The distinction matters: freight already committed can keep ships busy after new purchasing starts to slow.

Scheduled capacity tells a similarly uneven story. September’s Asia–US total is slightly below August, while the West Coast is set to gain space. At the origin, missed port calls still leave some exporters with fewer loading options. Panama constraints then complicate East and Gulf Coast routings. A larger trade total offers little relief to cargo waiting at a port the vessel skips.

China and Taiwan spot rates are about $7,700 per 40-foot to the West Coast and $9,800–$10,900 to the East Coast. The latest complete vessel record, for July, was only about 68% on time on both coast groupings. After discharge, longer rail dwell and higher drayage and truckload costs add to the bill. Fuel changes in Q4 vary by schedule, offering no uniform offset.

Demand / Timing

A stronger September import forecast does not extend into Q4

NRF and Hackett raised September’s forecast from 2.16 million to 2.31 million import TEU, an increase of 150,000 TEU from the August outlook. Meanwhile, the combined October–December forecast fell by about 80,000 TEU. The revision strengthens the near-term arrival story without establishing a stronger holiday selling season.

The July actual was 2.30 million TEU, above the earlier estimate. August remains an estimate and September a forecast. Recent disruption is part of the explanation for the changed calendar; it cannot account for every additional container.

September is forecast to lead US import arrivals this year

NRF-tracked US import ports · million TEU · July actual, August estimate, September–December forecast

September is now forecast to be the busiest arrival monthJuly: 9 September release 2.3 m TEU; August: 9 September release 2.29 m TEU; September: 9 September release 2.31 m TEU; October: 9 September release 2.11 m TEU; November: 9 September release 2.0 m TEU; December: 9 September release 2.03 m TEU0122.30Jul2.29Aug2.31Sep2.11Oct2.00Nov2.03DecSeptember is now forecast to be the busiest arrival monthJuly: 9 September release 2.3 m TEU; August: 9 September release 2.29 m TEU; September: 9 September release 2.31 m TEU; October: 9 September release 2.11 m TEU; November: 9 September release 2.0 m TEU; December: 9 September release 2.03 m TEU0122.30Jul2.29Aug2.31Sep2.11Oct2.00Nov2.03Dec
Source: NRF / Hackett

US import forecast revisions add to September and subtract from Q4

Import TEU · change from 7 August to 9 September forecast

The September forecast rose; Q4 estimates easedSeptember: Forecast revision 150 k TEU; October: Forecast revision -20 k TEU; November: Forecast revision -30 k TEU; December: Forecast revision -30 k TEUSeptember+150k TEU2.16m → 2.31m TEUOctober-20k TEU2.13m → 2.11m TEUNovember-30k TEU2.03m → 2.00m TEUDecember-30k TEU2.06m → 2.03m TEU-50k0k50k100k150kThe September forecast rose; Q4 estimates easedSeptember: Forecast revision 150 k TEU; October: Forecast revision -20 k TEU; November: Forecast revision -30 k TEU; December: Forecast revision -30 k TEUSeptember+150k TEU2.16m → 2.31m TEUOctober-20k TEU2.13m → 2.11m TEUNovember-30k TEU2.03m → 2.00m TEUDecember-30k TEU2.06m → 2.03m TEU-50k0k50k100k150k
Source: NRF / Hackett

Demand / What fills the ships

US consumer spending offers little support for a goods import surge

July consumer spending barely grew after inflation. In dollar terms, spending on services rose while goods spending fell. That is a weak foundation for assuming a broad consumer-led import surge.

Factories tell a more varied story. July output of business equipment and construction supplies each rose 0.8%, while consumer-goods output fell 0.4%. JOC’s late-August interviews described electrical equipment, cooling systems, wiring, batteries and data-center construction supporting trans-Pacific cargo. These flows do not all follow the holiday retail calendar.

Our assessment: delayed arrivals, restocking and industrial purchases together explain more of the September pressure than a single “strong demand” label.

Macro / Orders and replenishment

US manufacturing orders are growing more slowly

August’s ISM manufacturing reading remained above 50. New orders, imports and order backlogs all expanded more slowly than in July, while supplier deliveries slowed further. Customers still described inventories as too low. That combination supports continued inbound orders while warning against extrapolating the recent pace.

The distinction for an importer is between freight already committed and the next round of purchasing. Cargo waiting at origin can sustain tight departures even as new demand loses momentum. We would expect space to ease as the backlog clears and more usable departures return. The calendar alone is a weak guide this year.

US manufacturing: orders and imports still grow, but more slowly

ISM diffusion indexes · July vs August 2026 · 50 marks no change

US manufacturing: orders and imports still grow, but more slowlyNew orders: July 56.7 index, August 53.7 index; Imports: July 55.7 index, August 52.5 index; Production: July 58.5 index, August 58.3 index; Order backlog: July 55 index, August 51.8 indexNew orders5056.753.7JulAugImports5055.752.5JulAugProduction5058.558.3JulAugOrder backlog5055.051.8JulAugUS manufacturing: orders and imports still grow, but more slowlyNew orders: July 56.7 index, August 53.7 index; Imports: July 55.7 index, August 52.5 index; Production: July 58.5 index, August 58.3 index; Order backlog: July 55 index, August 51.8 indexNew orders5056.753.7JulAugImports5055.752.5JulAugProduction5058.558.3JulAugOrder backlog5055.051.8JulAug
Source: ISM

Business equipment grew while consumer-goods output fell

US industrial production · July 2026 monthly change · seasonally adjusted

Business equipment grew while consumer-goods output fellBusiness equipment: Monthly output change 0.8 %; Construction supplies: Monthly output change 0.8 %; Consumer goods: Monthly output change -0.4 %Business equipment+0.8%Construction supplies+0.8%Consumer goods-0.4%-0.5%0%0.5%1%Business equipment grew while consumer-goods output fellBusiness equipment: Monthly output change 0.8 %; Construction supplies: Monthly output change 0.8 %; Consumer goods: Monthly output change -0.4 %Business equipment+0.8%Construction supplies+0.8%Consumer goods-0.4%-0.5%0%0.5%1%
Source: Federal Reserve

Macro / The global allocation of ships

Record global container volumes compete for shipping capacity

The broader container market is still growing. CTS reported a record 17.3 million TEU lifted worldwide in July, up 4.5% from a year earlier. Global volume through July was 5.1% higher. Subdued US consumer-goods spending therefore sits inside a busier worldwide shipping market.

Alphaliner’s CTS tables put first-half Far East–US container growth at about 5%, compared with roughly 13% to Europe, 16% to South and Central America and 28% to sub-Saharan Africa. The US was not the only market drawing ships and equipment.

For North American importers, the implication is competition for ships and equipment. Stronger cargo growth elsewhere gives carriers alternatives when deciding where to deploy their next available vessel. With little commercially idle tonnage, relief has to come from new deliveries, faster rotations or a deliberate reassignment from another trade.

Source: CTS.

Sources: NRF / Hackett; BEA, July spending; Federal Reserve, July output; ISM, August; JOC, cargo demand.

Global trade comparisons: Alphaliner August monitor, CTS first-half data.

Regulation & geopolitics

Tariffs and disrupted shipping routes add to importers’ costs

The useful distinction is between costs already in force, operational disruption now affecting cargo, and decisions that could change the next quarter.

Goods tariffs are in force; maritime fees and fuel rules face Q4 decisions

Selected policy dates · 2026

  1. In force

    Goods tariffs

    10% or 12.5%

    Covered goods from 60 economies, with exemptions and country-specific treatment.

  2. Watchpoint

    Maritime fees

    1-year suspension

    Anniversary of the suspension. Watch for an official decision; these fees are not a September cost.

  3. Scheduled / provisional

    IMO fuel rules

    Next negotiations

    Main committee: 30 Nov–3 Dec. Extraordinary session planned for 4 Dec, subject to confirmation.

Sources: USTR · CBP · IMO

Alternative sourcing origins also face tariff exposure

The forced-labor-related Section 301 action took effect on 24 July, setting duties of 10% or 12.5% for covered goods from 60 economies, subject to product exemptions and country-specific treatment. For importers shifting purchases away from China, a new origin may still carry exposure under this action. These goods duties are separate from the maritime Section 301 measures.

Freight is only one part of that sourcing calculation. Duty treatment can outweigh a lower ocean quote, while a new origin may require feeder transport or offer fewer direct departures. The relevant comparison is the landed cost and delivery plan for the product.

The tariff heading and applicable exemptions determine the duty on an individual entry. The policy creates a reason to reassess sourcing; it does not, by itself, explain every summer volume shift.

Sources: USTR action; CBP implementation.

The maritime fee suspension reaches its anniversary in November

The separate US action concerning China's maritime, logistics and shipbuilding sectors was suspended for one year beginning 10 November 2025. Under that suspension, the covered maritime-service fees do not accrue. The approaching November anniversary matters for planning, but it should not be presented as a fee already driving September freight costs.

If those measures resume or change, exposure could depend on vessel ownership, operation or construction, as well as carriers’ deployment and pricing responses. That would require a fresh review of the rule and the service offered.

For now, a new official decision is the event to watch. The suspended fees should not be included as an existing September cost.

Source: USTR suspension notice.

Suez / The capacity release

Partial Suez returns release less capacity than full round trips

Selected carriers are moving services back through Suez, reducing the ship time needed on those rotations. But the return remains uneven by direction. Alphaliner’s later August reporting says one MSC route retained the Cape westbound while using Suez eastbound. Counting the route as a full return would overstate the capacity released.

The forecasts also disagree. Sea-Intelligence’s September commentary expects commercial pressure to accelerate a broad return; Drewry’s August outlook assumes a slower process because renewed attacks could reverse it. We would treat sustained two-way operation and ships actually released from rotations as the evidence of relief. A change to an Asia–Europe service does not automatically create a North America departure.

Hormuz / Cargo and equipment

Gulf shipping recovery requires more than reopening Hormuz

The Strait of Hormuz disruption has interrupted Gulf services, displaced cargo and complicated container positioning across nearby hubs. Restoring navigation would help, but carriers also need insurance, crew confidence and functioning port connections before normal rotations return.

For subcontinent–North America freight, the exposure can be indirect: equipment and connecting capacity may be tied up even when the US-bound vessel avoids the Gulf. The regional deployment totals do not establish a matching percentage reduction on the North America trade. We assess the effect through the origins and connections actually available.

Regulatory watch / Fuel and emissions

Global shipping emissions rules await further negotiations

The proposed global fuel standard and emissions-pricing framework is not a new September charge. IMO’s current schedule puts the next main committee meeting at 30 November–3 December, with the extraordinary session planned to resume on 4 December, subject to confirmation. That is later than the October timing carried in older coverage.

The eventual rules could affect fuel choices, fleet investment and the cost of operating a service. For this issue, the direct budget evidence is the published Q4 bunker schedules below. A proposed global measure should not be folded into those charges as though it were already payable.

Sources: IMO, current meeting outcome; IMO, framework status.

Routing analysis: Alphaliner weeks 34–35; Drewry August; JOC, Suez and Hormuz reporting, August–September.

Capacity & carrier decisions

Delays and skipped calls limit the benefit of added capacity

The scarce product is a workable departure from the right origin, followed by a terminal and inland move that can absorb the cargo.

The larger vessel delivery wave arrives in 2027–28

Alphaliner’s adjusted full-year newbuilding forecast rises from about 1.6 million TEU in 2026 to 3.5 million in 2027 and 5.7 million in 2028. That is the future supply risk. It should not be used to explain September as though all those ships were already available.

Some capacity has been added now. Alphaliner’s August measure of Far East–North America weekly nominal capacity, including Canada, was about 5% above a year earlier. Looking specifically at the US, the 25 August eeSea outlook put September scheduled capacity at 2.24 million TEU versus 2.26 million in August, approximately 1% lower. Within that total, West Coast capacity was expected to rise 2.5% to 1.46 million TEU. That is a redistribution of scheduled space, not evidence of a broad transpacific withdrawal.

Alphaliner’s 24 August survey put commercially idle capacity at only 0.6% of the global cellular fleet, leaving little spare tonnage to cover disruption. Carriers can increase a gateway’s capacity with larger ships and changed rotations, but that may also remove calls at other ports. What matters to the exporter is whether the additional space can be loaded at its origin.

New vessel deliveries are forecast to accelerate in 2027–28

Gross new containership deliveries · million TEU · actual and forecast

The delivery wave is still ahead2025 actual: New vessel deliveries 2.189519 m TEU; 2026 forecast: New vessel deliveries 1.608321 m TEU; 2027 forecast: New vessel deliveries 3.548774 m TEU; 2028 forecast: New vessel deliveries 5.693314 m TEU2025 actual2.19m2026 forecast1.61m2027 forecast3.55m2028 forecast5.69m0m2m4m6mThe delivery wave is still ahead2025 actual: New vessel deliveries 2.189519 m TEU; 2026 forecast: New vessel deliveries 1.608321 m TEU; 2027 forecast: New vessel deliveries 3.548774 m TEU; 2028 forecast: New vessel deliveries 5.693314 m TEU2025 actual2.19m2026 forecast1.61m2027 forecast3.55m2028 forecast5.69m0m2m4m6m
Source: Alphaliner

Delays absorb about three times the usual fleet share

Estimated global fleet capacity absorbed by vessel delays · %

Delays absorb about three times the usual fleet sharePre-pandemic norm: Capacity absorbed 2.2 %; July 2026: Capacity absorbed 6.6 %0%2%4%6%8%2.2%Pre-pandemic norm6.6%July 2026Delays absorb about three times the usual fleet sharePre-pandemic norm: Capacity absorbed 2.2 %; July 2026: Capacity absorbed 6.6 %0%2%4%6%8%2.2%Pre-pandemic norm6.6%July 2026
Source: Sea-Intelligence

Vessel delays tie up 6.6% of global fleet capacity

Sea-Intelligence’s July estimate, reported by The Loadstar, puts capacity absorbed by delays at 6.6% of the fleet, compared with a pre-pandemic baseline near 2.2%. The estimated total is about 2.3 million TEU. It describes capacity made less productive by delay, not ships physically removed from service.

A longer rotation needs more ships to maintain weekly frequency. Without them, gaps open in the schedule. This helps explain how poor service and high rates can coexist: delays reduce the transport work the available fleet can perform.

The pressure is uneven. Braemar, quoted in the same article, described congestion as localized and said alternative services could absorb some displaced cargo. Where a substitute departure is available, a shipper has more options than the global congestion figure suggests.

Source: The Loadstar, reporting Sea-Intelligence and Braemar.

Scheduled Asia–US capacity shifts toward the West Coast in September

September schedule outlook · month-over-month change

Scheduled West Coast capacity rises within a smaller US totalAsia → US total: Scheduled capacity change -1 %; Asia → US West Coast: Scheduled capacity change 2.5 %Asia → US total-1.0%Asia → US West Coast+2.5%-2%0%2%4%Scheduled West Coast capacity rises within a smaller US totalAsia → US total: Scheduled capacity change -1 %; Asia → US West Coast: Scheduled capacity change 2.5 %Asia → US total-1.0%Asia → US West Coast+2.5%-2%0%2%4%
Source: eeSea / JOC

Transpacific sailings account for 68% of planned cancellations

Major East–West trades · 7 September–11 October 2026

Most departures remain scheduled; cancellations concentrate on the transpacificMajor East–West departures: Share 6.447187928669409 %; Where cancellations fall: Share 68 %47 of 729expected departures cancelled6.4% cancelled93.6% still scheduled68% of cancellationsfall on transpacific eastboundTranspacific 68%Other trades 32%Most departures remain scheduled; cancellations concentrate on the transpacificMajor East–West departures: Share 6.447187928669409 %; Where cancellations fall: Share 68 %47 of 729expected departures cancelled6.4% cancelled93.6% still scheduled68% of cancellationsfall on transpacific eastboundTranspacific 68%Other trades 32%
Source: Drewry

Skipped Chinese port calls leave cargo waiting for another departure

August reporting described extensive omissions at Shanghai, Ningbo and Yantian after storms. Skipping a port can help restore the rest of a rotation, but cargo at that origin must wait or find another service. The reported lost loading capacity covered several trades; it was not an equivalent withdrawal of ships from the global fleet.

That leaves fewer usable departures competing for cargo at the affected ports. It can support higher rates while making shipping plans harder to execute. July’s reliability figures predate these storms and cannot measure their effect.

US-bound cargo faces most of the announced East–West cancellations

Drewry’s 4 September snapshot puts cancellations at about 6% of expected departures across the major East–West trades. The transpacific eastbound trade accounts for 68% of those cancellations. That concentration matters to US importers, even though most scheduled sailings are still expected to operate.

Blank sailings can reduce excess supply, reset delayed rotations, or serve both purposes. Demand and deployment on the affected trade help distinguish those explanations. The cancellation count alone cannot establish why a carrier removed a sailing.

Other trades and higher charter costs compete for available ships

Strong demand on other trades can reduce the incentive to move ships into the transpacific. Charter costs also matter: Alphaliner's July survey showed most vessel-size categories becoming more expensive to hire than in June.

Carrier results show different starting positions. Maersk reported stronger Q2 ocean profitability and 96% utilization; Hapag-Lloyd reported substantial cost pressure. Those results help explain commercial incentives, but a carrier’s actual changes to deployment, allocation and pricing are better evidence of its response.

Sources: Alphaliner; JOC, port omissions; Drewry; Maersk Q2; Hapag-Lloyd Q2.

Reliability & transit

Similar coast averages hide large gaps in on-time arrivals

Both Asia–US coast groupings were about 68% on time in July. The carrier and alliance mix makes a substantial difference within those lane averages.

Asia–US on-time arrivals vary sharply by carrier and alliance

July’s Asia–US averages were nearly identical by coast, but the carrier and alliance results were not. West Coast on-time performance ranged from about 51% for Ocean Alliance to 92% for Gemini. On the East/Gulf grouping, Gemini was about 95%, while Premier was 61%. Those differences are more useful to a shipper than the small gap between the two coast averages.

These groups serve different port mixes, so the figures are not a comparison of identical shipments. They do show why a familiar carrier name or a higher quote is insufficient evidence of a dependable arrival. The relevant record is the one for the trade and destination under consideration.

Global reliability rankings can obscure trade-lane performance

A global carrier or alliance score combines different trades and operating conditions. Here, the comparison stays within the US coast served. Gemini, Ocean Alliance, Premier and MSC show materially different results, and the same grouping can perform differently on the two coasts.

Transit and punctuality also answer different questions. A long journey can run to schedule; an early arrival can disrupt a receiving plan. Separating early and late arrivals shows whether missed schedules primarily mean delayed inventory or a different timing problem.

Asia → US: the same network performs differently on each coast

On-time arrivals · July 2026 · US destination ports only

Asia → US: the same network performs differently on each coastGemini: US West Coast 92.3 %, US East Coast/Gulf 94.6 %; Ocean Alliance: US West Coast 51.1 %, US East Coast/Gulf 72.5 %; Premier: US West Coast 61.1 %, US East Coast/Gulf 60.6 %; MSC: US West Coast 71.1 %, US East Coast/Gulf 82.8 %; Other services: US West Coast 79.5 %, US East Coast/Gulf 42.0 %US WEST COASTUS EAST / GULFGemini92%95%Ocean Alliance51%73%Premier61%61%MSC71%83%Other services80%42%Darker cells = higher on-time shareAsia → US: the same network performs differently on each coastGemini: US West Coast 92.3 %, US East Coast/Gulf 94.6 %; Ocean Alliance: US West Coast 51.1 %, US East Coast/Gulf 72.5 %; Premier: US West Coast 61.1 %, US East Coast/Gulf 60.6 %; MSC: US West Coast 71.1 %, US East Coast/Gulf 82.8 %; Other services: US West Coast 79.5 %, US East Coast/Gulf 42.0 %US WESTCOASTUS EASTCOAST / GULFGemini92%95%Ocean Alliance51%73%Premier61%61%MSC71%83%Other services80%42%Darker cells = higher on-time share
Source: Sea-Intelligence

Ports & terminals

Larger vessel calls and slow container clearance strain terminals

A terminal has to handle the peak discharge, position the empties and get imports out of the yard. Monthly throughput alone does not show how difficult that work has become.

LA/Long Beach: rail dwell added almost a day

Mean terminal dwell · days · June and July 2026

LA/Long Beach: rail dwell added almost a dayRail cargo: June 5.43 days, July 6.34 days; Truck cargo: June 2.89 days, July 3.03 daysRail cargo5.4 days6.3 daysTruck cargo2.9 days3.0 days048LA/Long Beach: rail dwell added almost a dayRail cargo: June 5.43 days, July 6.34 days; Truck cargo: June 2.89 days, July 3.03 daysRail cargo5.4 days6.3 daysTruck cargo2.9 days3.0 days048
JuneJuly
Source: PMSA

Terminal operations / Bigger batches

Larger Long Beach calls concentrate more work into each visit

MSC’s announced Long Beach upsizing illustrates both sides. The first roughly 24,000-TEU weekly call was expected around 22 September. TTI said a call could exchange as much as 35,000 TEU across discharge and loading; that figure is not 35,000 import TEU.

Removing Oakland from the rotation can simplify stowage and reduce rehandling. Long Beach gains capacity, but it also has to coordinate a larger batch of cargo with railcars, truck appointments and available yard space. The ship’s lower unit cost does not make those receiving windows any wider.

Terminal capacity depends on more than cranes and acreage. A busy yard needs imports collected and empties repositioned before it can absorb the next large discharge. Bigger ships make coordination with rail and trucking more important, even when monthly volume appears manageable.

Empties / The extra work

Empty returns keep using terminal and trucking capacity

An import container is not finished with the terminal system when the goods are delivered. Where import and export flows are imbalanced, more equipment has to return empty. Those moves still use gates, chassis, yard slots and vessel handling.

July’s LA–Long Beach reporting ties restricted empty returns to occupied chassis and fewer dual transactions, where a driver drops an empty and collects an import in the same visit. Losing that turn adds another trip and keeps equipment tied up. The problem is the speed of the container cycle, even when the chassis fleet itself has not changed.

July also brought street restrictions around the Vincent Thomas Bridge project, including corridors used by overweight containers, and crane problems at Long Beach Container Terminal. LBCT expected improvement by the end of August. These explain part of the July dwell increase; they are not a claim that the same equipment problems remain unresolved in September.

Terminal ownership / Control of the receiving end

Carrier investment increases control over terminal operations

Hapag-Lloyd’s agreement for a 25% stake in APM Terminals Maasvlakte II is one example of carriers investing further into the port operation. Closer coordination can support berth planning and capital spending. It can also make neutral terminal alternatives more limited for competing services.

For a BCO, the value of that investment will be a more dependable port call and cargo release. Those results still need to be demonstrated. The announced projects also take years to deliver, leaving today’s importers dependent on how existing terminals manage their busiest windows.

Sources: JOC, Long Beach deployment; JOC, July dwell; JOC, terminal ownership.

Panama Canal / Surcharge economics

A Panama surcharge needs a voyage-level cost case

Restrictions can reduce cargo intake and make a transit harder to secure. They do not impose the same additional cost on every ship or every shipment.

The draft limit is holding at 48 feet

The Canal has postponed the planned October reduction to 47.5 feet. The current 48-foot limit remains, below the normal 50-foot allowance for the larger locks. That removes one further tightening from the immediate outlook; it does not restore normal conditions.

Two separate constraints matter. Draft limits restrict how much weight a ship can carry. Booking availability affects when it can transit. A vessel that needs to shed weight faces a different commercial problem from one that can carry its load but must wait for a slot.

A ship's size alone does not establish its loss

Our screening model illustrates the difference. At a 48-foot limit, the additional weight reduction is about 730 TEU-equivalent for one 13,100-TEU design, versus around 160 to 170 for the two mid-size designs shown. The 5,000-TEU design has no additional weight reduction in this scenario.

These are weight equivalents at an assumed 12 tonnes per laden TEU, not a count of boxes left behind. The comparison starts from each design's feasible loading under the normal 50-foot limit. A ship already drawing less than 48 feet would have no draft-related cargo reduction from this limit.

The same draft limit produces different cargo constraints

Selected ship designs · Modelled additional weight reduction at 48 feet · TEU-equivalent, rounded

The same draft limit produces different cargo constraints13,100-TEU design: Additional weight reduction 730 TEU; 10,600-TEU design: Additional weight reduction 170 TEU; 8,700-TEU design: Additional weight reduction 160 TEU; 5,000-TEU design: Additional weight reduction 0 TEU13,100-TEU design730 TEU10,600-TEU design170 TEU8,700-TEU design160 TEU5,000-TEU design0 TEU0200400600800The same draft limit produces different cargo constraints13,100-TEU design: Additional weight reduction 730 TEU; 10,600-TEU design: Additional weight reduction 170 TEU; 8,700-TEU design: Additional weight reduction 160 TEU; 5,000-TEU design: Additional weight reduction 0 TEU13,100-TEU design730 TEU10,600-TEU design170 TEU8,700-TEU design160 TEU5,000-TEU design0 TEU0200400600800
Source: Bluspark vessel model

The recovery test

At $500 per TEU, the amount collected adds up quickly

One published Asia to US East Coast and Gulf charge is $500 per TEU, or $1,000 per 40-foot container, for cargo via Panama from 10 September. The notice excludes Bangladesh to the US East Coast. This is a carrier charge, not a new flat Canal Authority fee.

Published charge$500 / TEU
Assumed TEU charged10,000
Total collected in this scenario$5.0m

At 10,000 TEU, each $100,000 of additional voyage cost equates to $10 per TEU, or $20 per 40-foot container.

Illustrative recovery calculation. Actual paying volume, negotiated charges and additional voyage costs are not disclosed.

Separate the existing transit bill from the added cost

A ship using Panama already has a canal transit cost. The case for an additional surcharge should identify what changed: extra booking expense, waiting time, a rerouting cost or earnings lost on cargo that could otherwise have been carried. Existing tolls should not be presented again as a new disruption cost.

For weight-related losses, the relevant commercial measure is the lost contribution after avoided costs, not simply the gross freight value of every theoretical slot. A draft calculation by itself supplies neither the actual load lost nor that contribution.

Perspective

Challenge the amount as well as the label

Our view is that a canal headline is an inadequate basis for accepting a blanket surcharge. The carrier should be able to connect the requested recovery to the affected voyage, the additional cost and the volume over which it is spread.

The public notice and vessel model do not establish actual over-recovery. They do show why a uniform charge deserves scrutiny: the operational impact varies considerably, while collections can reach millions of dollars on a single voyage. Where that explanation is missing, there is a clear basis to push back on the amount.

Sources: Panama Canal Authority; Carrier surcharge notice; Bluspark vessel model.

From the global market to your freight

Four trade lanes under different pressures

Rates, space and delivery conditions across four North American import lanes. Spot prices are indicative and shown per 40-foot container.

Asia → US West Coast

Asia–US West Coast: added capacity meets origin delays

Storm recovery and a mixed cargo peak are keeping China departures expensive. Larger ships help the lane total, while changes in calls redistribute the benefit.

Indicative spot rate$7,700China & Taiwan → USWC · per 40-foot · 1 Sep
On-time arrivals68.0%Asia → USWC · July
Actual ocean transit24.7 daysAsia → USWC · July

China and Taiwan–US West Coast spot rates reached about $7,700 per 40-foot in September, above the early-July level after a short-lived July decline. The rate history does not fit a smooth seasonal slowdown. Cargo and ship schedules have been interrupted, then compressed into the same departure windows.

Our assessment is that backlog clearance and industrial cargo are keeping usable origin space tighter than the headline capacity additions suggest. That is different from assuming carriers have removed capacity across the whole trade.

China & Taiwan → US West Coast: rates rebound after July’s decline

Spot rates per 40-foot · June–September 2026 · shading shows observed range

China & Taiwan → US West Coast: the July retreat has been reversed01 Jun: US West Coast 4850.0 $; 15 Jun: US West Coast 5575.0 $; 25 Jun: US West Coast 5525.0 $; 01 Jul: US West Coast 7550.0 $; 17 Jul: US West Coast 6700.0 $; 18 Jul: US West Coast 5800.0 $; 01 Aug: US West Coast 6550.0 $; 04 Aug: US West Coast 6850.0 $; 01 Sep: US West Coast 7700.0 $$4k$6k$8k$7,70001 Jun01 Jul01 Aug01 Sep1 Jul · $7,55018 Jul · $5,800China & Taiwan → US West Coast: the July retreat has been reversed01 Jun: US West Coast 4850.0 $; 15 Jun: US West Coast 5575.0 $; 25 Jun: US West Coast 5525.0 $; 01 Jul: US West Coast 7550.0 $; 17 Jul: US West Coast 6700.0 $; 18 Jul: US West Coast 5800.0 $; 01 Aug: US West Coast 6550.0 $; 04 Aug: US West Coast 6850.0 $; 01 Sep: US West Coast 7700.0 $$4k$6k$8k$7,700JunJulAugSep1 Jul · $7,55018 Jul · $5,800
Source: Bluspark spot rates
Cargo timing

Delayed shipments compete with new orders for space

The latest retail-port forecast places the arrival peak in September. Recent storms explain part of that shift, while late-August interviews also described industrial inputs and replenishment moving alongside retail freight.

For an importer loading in China, the important overlap is cargo left from missed departures competing with new bookings. A factory slowdown during Golden Week will not instantly remove a backlog already waiting for ships.

Departures

More scheduled West Coast capacity does not ensure access at origin

JOC’s 25 August eeSea outlook put scheduled September West Coast capacity at 1.46 million TEU, about 2.5% above August. That is a schedule forecast, not a count of completed September sailings.

Carriers can increase the trade total and still omit a congested load port. Ocean Alliance’s rotation changes also redistribute calls between origins. The consequence is specific: some exporters gain a weekly option while others need another sailing or connection.

Carrier response

Larger Long Beach calls come with the loss of an Oakland call

MSC is upsizing its Long Beach deployment and removing Oakland from the affected rotation. A larger ship can carry more cargo, but the lost Oakland call still needs a replacement option.

At Long Beach, the cargo arrives in a larger batch that must fit terminal, rail and drayage windows. Capacity gains are most useful when the receiving side can clear the call before the next one.

Delivery record

West Coast on-time arrivals range from 51% to 92% by network

July’s observed ocean transit averaged 24.7 days, with 68.0% on-time arrivals. Gemini was about 92% on time, MSC 71%, Premier 61% and Ocean Alliance 51%; the other-services group was about 80%.

Those are observed groups with different port mixes, not a controlled comparison of identical shipments. Even so, the spread is too large to ignore when a late arrival carries a stockout or expedited-delivery cost. A higher spot rate does not erase that risk.

Ocean Alliance was almost as often late as on time

Asia → US West Coast · carrier / alliance · July 2026

Ocean Alliance was almost as often late as on timeGemini: On time 92.3 %, Early 3.9 %, Late 3.9 %; Ocean Alliance: On time 51.1 %, Early 1.8 %, Late 47.0 %; Premier: On time 61.1 %, Early 1.8 %, Late 37.1 %; MSC: On time 71.1 %, Early 0.0 %, Late 29.0 %; Other services: On time 79.5 %, Early 2.1 %, Late 18.5 %Gemini92.3% on time92%Ocean Alliance51.1% on time51%47%Premier61.1% on time61%37%MSC71.1% on time71%29%Other services79.5% on time80%19%0%25%50%75%100%Ocean Alliance was almost as often late as on timeGemini: On time 92.3 %, Early 3.9 %, Late 3.9 %; Ocean Alliance: On time 51.1 %, Early 1.8 %, Late 47.0 %; Premier: On time 61.1 %, Early 1.8 %, Late 37.1 %; MSC: On time 71.1 %, Early 0.0 %, Late 29.0 %; Other services: On time 79.5 %, Early 2.1 %, Late 18.5 %Gemini92.3% on time92%Ocean Alliance51.1% on time51%47%Premier61.1% on time61%37%MSC71.1% on time71%29%Other services79.5% on time80%19%0%25%50%75%100%
On timeEarlyLate
Source: Sea-Intelligence

Our watchpoint: whether Chinese port calls are restored and backlogs shrink as the September capacity actually sails. Those changes would make a rate easing more credible than a seasonal forecast alone.

Sources: Bluspark spot rates; Sea-Intelligence; JOC, demand and scheduled capacity, 25 August; JOC, port omissions, 21 August; JOC, Sentosa, 1 September.

Asia → US East Coast & Gulf

Asia–US East Coast: higher rates without better average reliability

China and Taiwan’s East Coast rates remain well above the West Coast. The difference reflects a longer route with fewer easy ways to recover lost time.

Indicative spot range$9.8k–$10.9kChina & Taiwan → USEC · per 40-foot · 1 Sep
On-time arrivals68.2%Asia → USEC/Gulf · July
Actual ocean transit43.8 daysAsia → USEC/Gulf · July

Gulf spot range: about $9.9k–$11.6k from China and Taiwan per 40-foot, 1 September.

The East Coast premium from China and Taiwan widened from about $1,200 per 40-foot in early June to around $3,300 in early August. It was roughly $2,600 by September. That narrowing came while both coast prices rose; it does not mean East Coast freight became cheaper.

Origin backlogs affect both coasts. The East and Gulf Coast trades then face Panama booking constraints or a longer alternative route. July’s lane record was only marginally more punctual than the West Coast’s, despite an observed ocean journey almost three weeks longer.

Both coast prices rose as the East Coast premium narrowed

China & Taiwan → US · spot rates per 40-foot · shading shows observed range

Both coast prices rose as the East Coast premium narrowed01 Jun: US West Coast 4850 $, US East Coast 6050 $; 15 Jun: US West Coast 5575 $, US East Coast 6775 $; 25 Jun: US West Coast 5525 $, US East Coast 6775 $; 01 Jul: US West Coast 7550 $, US East Coast 9100 $; 17 Jul: US West Coast 6700 $, US East Coast 9000 $; 18 Jul: US West Coast 5800 $, US East Coast 8900 $; 01 Aug: US West Coast 6550 $, US East Coast 9700 $; 04 Aug: US West Coast 6850 $, US East Coast 10144 $; 01 Sep: US West Coast 7700 $, US East Coast 10344 $$4k$6k$8k$10k$12k$7,700$10,34401 Jun01 Jul01 Aug01 SepBoth coast prices rose as the East Coast premium narrowed01 Jun: US West Coast 4850 $, US East Coast 6050 $; 15 Jun: US West Coast 5575 $, US East Coast 6775 $; 25 Jun: US West Coast 5525 $, US East Coast 6775 $; 01 Jul: US West Coast 7550 $, US East Coast 9100 $; 17 Jul: US West Coast 6700 $, US East Coast 9000 $; 18 Jul: US West Coast 5800 $, US East Coast 8900 $; 01 Aug: US West Coast 6550 $, US East Coast 9700 $; 04 Aug: US West Coast 6850 $, US East Coast 10144 $; 01 Sep: US West Coast 7700 $, US East Coast 10344 $$4k$6k$8k$10k$12k$7,700$10,344JunJulAugSep
US West CoastUS East Coast
Source: Bluspark spot rates
Shared origin pressure

Chinese port backlogs delay cargo before the longer ocean journey

A missed load-port call can delay departure before the all-water transit begins. Cargo approaching the October holiday therefore faces both the origin queue and the longer sailing calendar.

This compounds the effect of disruption; it is not evidence that every East Coast price increase came from Panama. Demand, origin allocation and the carrier’s available rotation all contribute.

Panama

Panama draft relief leaves booking-slot restrictions in place

The Canal’s 4 September notice retained a 48-foot maximum draft and postponed the planned October reduction to 47.5 feet. Separate reservation measures still reduce the number of available daily slots.

A carrier with a reserved passage faces a different problem from a delayed vessel needing another slot. In interviews published on 2 September, forwarders described lighter cargo being prioritized for Panama and heavier cargo redirected. The later draft notice avoids an additional loading-depth reduction; it does not restore every reservation or reverse cargo choices already made.

See the Panama surcharge analysis for the vessel-impact comparison and the cost case behind the charge.

Carrier decisions

Panama diversions extend some voyages by 10–13 days

September reporting describes selected ships avoiding Panama, including Cape diversions adding roughly 10–13 days on the affected voyages. These are voyage-specific examples, not a lane-wide addition to published transit.

The same September reporting describes importers switching to West Coast transloading, using trucks to avoid both the all-water delay and rising port rail dwell. That shifts demand into truck appointments, transload facilities and domestic transport. The ocean alternative changes the inland requirements as well as the sailing time.

Arrival performance

East Coast reliability depends heavily on the carrier and alliance

The July East/Gulf record averaged 43.8 days in ocean transit and 68.2% on time. Gemini was about 95%, MSC 83%, Ocean Alliance 73% and Premier 61%; the other-services group was 42%.

A missed schedule is not always a late arrival. Premier’s sample included about 19% early arrivals and 20% late, compared with roughly 4% early and 24% late for Ocean Alliance. The type of miss matters for warehouse and inventory planning.

Gemini led East/Gulf on-time arrivals; Premier also had early misses

Asia → US East Coast/Gulf · carrier / alliance · July 2026

Gemini led on time; Premier’s misses included early arrivalsGemini: On time 94.6 %, Early 0.0 %, Late 5.4 %; Ocean Alliance: On time 72.5 %, Early 3.8 %, Late 23.8 %; Premier: On time 60.6 %, Early 19.2 %, Late 20.2 %; MSC: On time 82.8 %, Early 2.2 %, Late 15.1 %; Other services: On time 42.0 %, Early 5.8 %, Late 52.2 %Gemini94.6% on time95%Ocean Alliance72.5% on time73%24%Premier60.6% on time61%19%20%MSC82.8% on time83%15%Other services42.0% on time42%52%0%25%50%75%100%Gemini led on time; Premier’s misses included early arrivalsGemini: On time 94.6 %, Early 0.0 %, Late 5.4 %; Ocean Alliance: On time 72.5 %, Early 3.8 %, Late 23.8 %; Premier: On time 60.6 %, Early 19.2 %, Late 20.2 %; MSC: On time 82.8 %, Early 2.2 %, Late 15.1 %; Other services: On time 42.0 %, Early 5.8 %, Late 52.2 %Gemini94.6% on time95%Ocean Alliance72.5% on time73%24%Premier60.6% on time61%19%20%MSC82.8% on time83%15%Other services42.0% on time42%52%0%25%50%75%100%
On timeEarlyLate
Source: Sea-Intelligence

Our watchpoint: whether stable Canal bookings and restored origin calls translate into repeatable departures. Selective routing relief is useful; a lane-wide improvement still needs to show up in execution.

Sources: Bluspark spot rates; Sea-Intelligence; Panama Canal A-33, draft advisory and A-29, reservation measures. JOC, routing.

Indian subcontinent → US West Coast

Subcontinent–US West Coast: equipment access constrains bookings

Rates rose more moderately than on the East Coast, but equipment access and a roughly six-week ocean journey still make this a demanding lane.

Indicative spot range$7.7k–$7.8kSubcontinent → USWC · per 40-foot · 1 Sep
On-time arrivals71.4%Subcontinent → USWC · July · limited coverage
Actual ocean transit41.1 daysSubcontinent → USWC · July · limited coverage

India–US West Coast spot observations rose about 20% from July to September, reaching $7,700 per 40-foot. Across the reviewed subcontinent origins, September offers cluster around $7,700–$7,800. The similar price levels should not be read as identical access to equipment or sailings.

For this lane, the origin process is central to the story. A workable rate and a scheduled vessel are insufficient if an empty container cannot reach the factory and return laden before cutoff. Mundra’s depot dispute puts that problem in concrete terms.

India → US West Coast: the rate rose 20% from July to September

Spot observations per 40-foot · June–September 2026

India → US West Coast: the rate rose 20% from July to September2026-06-01: Western & eastern India → USWC 4850 $; 2026-06-10: Western & eastern India → USWC 4850 $; 2026-06-21: Western & eastern India → USWC 6000 $; 2026-07-01: Western & eastern India → USWC 6400 $; 2026-08-03: Western & eastern India → USWC 7300 $; 2026-09-01: Western & eastern India → USWC 7700 $$4k$6k$8k$7,7001 Jun1 Jul3 Aug1 Sep1 Jul · $6,400India → US West Coast: the rate rose 20% from July to September2026-06-01: Western & eastern India → USWC 4850 $; 2026-06-10: Western & eastern India → USWC 4850 $; 2026-06-21: Western & eastern India → USWC 6000 $; 2026-07-01: Western & eastern India → USWC 6400 $; 2026-08-03: Western & eastern India → USWC 7300 $; 2026-09-01: Western & eastern India → USWC 7700 $$4k$6k$8k$7,700JunJul3 AugSep1 Jul · $6,400
Source: Bluspark spot rates
Mundra

The Mundra depot dispute interrupts empty-container movements

Adani’s decision to concentrate empty handling inside the port SEZ prompted depot operators and truckers to halt movements. Adani says the new yard will improve coordination; the affected businesses contest the loss of depot choice.

The 7 September reporting still described no breakthrough and a growing pile-up of empties. This is a dated local disruption, not proof of a uniform equipment shortage at every Indian port.

Network access

Limited allocations can force a different departure or connection

Subcontinent cargo can depend on direct North America capacity or on connections through Asian hubs. September operating reports describe equipment and allocation constraints, so an alternative offer may involve another departure or transfer.

Our assessment is that a nominally similar rate can buy a materially different journey. The origin, the connection and the confirmed loading opportunity matter more than the subcontinent label alone.

Transit

Subcontinent–West Coast ocean transit remains around six weeks

The July sample averaged 41.1 days to US West Coast destinations. February–July monthly averages ranged from 40.5 to 43.8 days. That is the sailing record after departure; it does not include a factory waiting for equipment.

Shortening a mainline schedule would help, but it would leave any pre-departure delay intact. This lane needs progress on both equipment movement and the ocean journey.

Booking access

Equipment availability and onward space must recover together

A settlement at Mundra would remove one obstacle for affected cargo. The next test is whether released equipment can reach the factory, return before cutoff and obtain the intended departure. Cargo using a connecting service also needs space on the onward vessel.

Our assessment is that the first useful sign of relief will be more workable bookings. The ocean transit record has stayed close to six weeks, so a lower quote alone would do little to shorten the delivery plan.

Subcontinent → US West Coast: observed ocean transit stays near six weeks

Actual ocean transit · February–July 2026 · limited lane coverage

Subcontinent → US West Coast: observed ocean transit stays near six weeksFebruary: Ocean transit 40.5 days; March: Ocean transit 42.6 days; April: Ocean transit 43.5 days; May: Ocean transit 42.3 days; June: Ocean transit 43.8 days; July: Ocean transit 41.1 days3540455041.1 daysFebMarAprMayJunJulSubcontinent → US West Coast: observed ocean transit stays near six weeksFebruary: Ocean transit 40.5 days; March: Ocean transit 42.6 days; April: Ocean transit 43.5 days; May: Ocean transit 42.3 days; June: Ocean transit 43.8 days; July: Ocean transit 41.1 days3540455041.1 daysFebMarAprMayJunJul
Source: Sea-Intelligence

Our watchpoint: a settlement at Mundra followed by actual empty-container releases and resumed truck movements. A yard announcement on its own does not establish that cargo is flowing.

Sources: Bluspark spot rates; Sea-Intelligence; Flexport; C.H. Robinson.

Sources: The Loadstar, Mundra dispute; Adani’s yard announcement.

Indian subcontinent → US East Coast & Gulf

Subcontinent–US East Coast rates rise faster than West Coast rates

Origin choice and access to the North America network matter more this month. Better July arrival scores have not prevented a difficult booking market.

Indicative spot range$9.5k–$12.0kSubcontinent → USEC · per 40-foot · 1 Sep
On-time arrivals85.0%Subcontinent → USEC/Gulf · July
Actual ocean transit40.6 daysSubcontinent → USEC/Gulf · July

Prices above cover US East Coast destinations. Vessel performance covers the East Coast and Gulf together; a separate Gulf spot range is unavailable in this issue.

Western India–US East Coast spot observations more than doubled from July to September, reaching $9,500 per 40-foot; eastern India reached $11,500. Over the same period, the India–West Coast series rose about 20%. This is not one uniform increase in “India freight.”

Our assessment is that East Coast access has repriced more severely within the wider regional disruption. The widening coast spread points to a more acute constraint on the East Coast offer. Equipment, connections and carrier pricing all contribute to that pressure.

India → US East Coast: rates rise sharply over the summer

Spot observations per 40-foot · June–September 2026

India → US East Coast: a much sharper summer repricing2026-06-01: Western India → USEC 2250 $, Eastern India → USEC 2700 $, India → USWC, for comparison 4850 $; 2026-06-10: Western India → USEC 3100 $, Eastern India → USEC 3700 $, India → USWC, for comparison 4850 $; 2026-06-21: Western India → USEC 4000 $, Eastern India → USEC 4600 $, India → USWC, for comparison 6000 $; 2026-07-01: Western India → USEC 4300 $, Eastern India → USEC 4900 $, India → USWC, for comparison 6400 $; 2026-08-03: Western India → USEC 7000 $, Eastern India → USEC 10500 $, India → USWC, for comparison 7300 $; 2026-09-01: Western India → USEC 9500 $, Eastern India → USEC 11500 $, India → USWC, for comparison 7700 $1 JULY1 SEPTEMBERWestern India → USEC$4,300$9,500+121%Eastern India → USEC$4,900$11,500+135%India → USWC$6,400$7,700+20%India → US East Coast: a much sharper summer repricing2026-06-01: Western India → USEC 2250 $, Eastern India → USEC 2700 $, India → USWC, for comparison 4850 $; 2026-06-10: Western India → USEC 3100 $, Eastern India → USEC 3700 $, India → USWC, for comparison 4850 $; 2026-06-21: Western India → USEC 4000 $, Eastern India → USEC 4600 $, India → USWC, for comparison 6000 $; 2026-07-01: Western India → USEC 4300 $, Eastern India → USEC 4900 $, India → USWC, for comparison 6400 $; 2026-08-03: Western India → USEC 7000 $, Eastern India → USEC 10500 $, India → USWC, for comparison 7300 $; 2026-09-01: Western India → USEC 9500 $, Eastern India → USEC 11500 $, India → USWC, for comparison 7700 $1 July → 1 SeptemberWestern India → USEC$4,300$9,500+121%Eastern India → USEC$4,900$11,500+135%India → USWC$6,400$7,700+20%
Source: Bluspark spot rates
Origins

Subcontinent–East Coast spot rates vary by $2,500 across origins

Western India was $9,500, eastern India and Pakistan $11,500, and Sri Lanka and Bangladesh $12,000 in the available East Coast observations. The span is about $2,500 per container.

Direct-service access and equipment conditions differ across those origins. A nearby sourcing market is not necessarily an equivalent transport option, even before duty treatment is considered.

Regional disruption

The Mundra dispute adds to wider equipment and allocation constraints

The empty-depot dispute can stop western Indian cargo reaching its booked vessel. Elsewhere, equipment and connecting allocations remain separate constraints. These pressures overlap, so restoring movement at Mundra would help the affected origins without necessarily easing the wider East Coast booking market.

Direct departures and connecting space also have to be considered separately. More ships deployed across the broader region will only help this lane if carriers provide usable North America allocations at the affected origins.

Routing changes

Shorter India–East Coast schedules await measured transit results

Selected India–East Coast schedules are being revised as carriers adjust services and Suez routing. August reporting described a 28-day Mundra–New York offer, but did not obtain carrier confirmation of the proposed routing explanation.

That is an offered transit on a particular option, not a demonstrated lane average. We would assess the change through completed sailings before treating it as a lasting reduction in inventory time.

Reliability

July arrivals improved despite difficult booking conditions

July East/Gulf arrivals were 85% on time, compared with 57% in March, and observed ocean transit averaged 40.6 days. This is a stronger recent arrival record than the Asia–US lane averages.

The vessels in that record sailed. Cargo still waiting for a container or allocation is outside it. The distinction explains why an importer can see better reliability data yet face a much more expensive and difficult booking.

Subcontinent → US: a $2,500 origin spread on the East Coast

Spot rates · USD per 40-foot container · 1 Sep 2026

Subcontinent → US: a $2,500 origin spread on the East CoastWestern India: US West Coast 7700 $, US East Coast 9500 $; Eastern India: US West Coast 7700 $, US East Coast 11500 $; Pakistan: US West Coast 7700 $, US East Coast 11500 $; Sri Lanka: US West Coast 7800 $, US East Coast 12000 $; Bangladesh: US West Coast 7700 $, US East Coast 12000 $Western India$7,700$9,500Eastern India$7,700$11,500Pakistan$7,700$11,500Sri Lanka$7,800$12,000Bangladesh$7,700$12,000$0k$7k$14kSubcontinent → US: a $2,500 origin spread on the East CoastWestern India: US West Coast 7700 $, US East Coast 9500 $; Eastern India: US West Coast 7700 $, US East Coast 11500 $; Pakistan: US West Coast 7700 $, US East Coast 11500 $; Sri Lanka: US West Coast 7800 $, US East Coast 12000 $; Bangladesh: US West Coast 7700 $, US East Coast 12000 $Western India$7,700$9,500Eastern India$7,700$11,500Pakistan$7,700$11,500Sri Lanka$7,800$12,000Bangladesh$7,700$12,000$0k$7k$14k
US West CoastUS East Coast
Source: Bluspark spot rates

Subcontinent → US East Coast/Gulf: July arrivals improved

On-time vessel arrivals · US destinations · Feb–Jul 2026

Subcontinent → US East Coast/Gulf: July arrivals improvedFebruary: On-time arrivals 73.7 %; March: On-time arrivals 57.3 %; April: On-time arrivals 73.0 %; May: On-time arrivals 84.6 %; June: On-time arrivals 82.4 %; July: On-time arrivals 85.0 %0%25%50%75%100%85.0%FebMarAprMayJunJulMarch · 57.3%Subcontinent → US East Coast/Gulf: July arrivals improvedFebruary: On-time arrivals 73.7 %; March: On-time arrivals 57.3 %; April: On-time arrivals 73.0 %; May: On-time arrivals 84.6 %; June: On-time arrivals 82.4 %; July: On-time arrivals 85.0 %0%25%50%75%100%85.0%FebMarAprMayJunJulMarch · 57.3%
Source: Sea-Intelligence

Our watchpoint: whether revised routings deliver shorter actual transits while bookings and equipment become easier to obtain.

Sources: Bluspark spot rates; Sea-Intelligence; Alphaliner, week 32; ONE service advisory; JOC, Suez routing.

Sources: Mundra update.

Ports / Drayage / Truckload / Rail

Inland transport and fuel costs

The next move shapes the delivered cost.

US inland / Drayage, truckload & rail

Slower container turns and tighter trucking capacity raise inland costs

A slower container cycle, a smaller pool of usable trucking capacity and truck-to-rail conversion are affecting the same gateways used by Asia and subcontinent cargo.

Drayage / Capacity is also productivity

Delayed empty returns reduce the number of imports a truck can collect

Mid-August spot drayage readings were about 12% above a year earlier on the East Coast and 17% on the Gulf. Norfolk and Savannah were among the stronger increases, at 23% and 19%. These are market readings, not a uniform increase on every move.

Fuel, labor and equipment each contribute to the drayage increase. Higher diesel costs raise the cost of a trip; fewer available drivers limit the trips offered; a chassis tied to an empty cannot collect another import. Savannah also handled roughly 1,000–1,500 more daily gate transactions in late July than in June, increasing the work competing for local capacity.

The loss of dual transactions makes those constraints more expensive. A driver who cannot return an empty and collect an import in one visit may need a separate trip, while the chassis remains occupied. That reduces turns per driver and per chassis. Drayage rates can therefore rise before a port reaches a general congestion crisis.

East and Gulf Coast drayage both became more expensive

Regional spot drayage change · year over year · mid-August 2026

East and Gulf Coast drayage both became more expensiveUS East Coast: Year-over-year change 12 %; US Gulf Coast: Year-over-year change 17 %US East Coast+12.0%US Gulf Coast+17.0%0%5%10%15%20%East and Gulf Coast drayage both became more expensiveUS East Coast: Year-over-year change 12 %; US Gulf Coast: Year-over-year change 17 %US East Coast+12.0%US Gulf Coast+17.0%0%5%10%15%20%
Source: Drayrates / JOC

Terminal to rail / The wait before the train

LA–Long Beach rail dwell rose by almost a day in July

Rail-bound containers averaged 6.34 days in the terminal, up from 5.43 in June. Truck-bound dwell rose much less, from 2.89 to 3.03 days. The rail increase was roughly 22 hours before the onward train journey.

PMSA described July conditions as manageable overall. For rail-bound cargo, however, an extra terminal day is still an extra day before the train journey. The local constraints described in the ports section help explain why rising imports translated into longer dwell at particular terminals.

A national rail-speed improvement would not cancel this terminal wait. Train movement, port rail stacks and inland ramp release are separate parts of the trip. They need to be assessed on the same actual shipment before adding up a promised door transit.

Truckload / Price levels and direction

Truckload prices eased in August but remained well above November

JOC’s preliminary August shipper-paid truckload reading fell about 1.5% from July. It was the first monthly decline in nine months, but the reading remained roughly 42% above November. Seasonal easing is real. So is the much higher starting point for the next contract.

RXO reported second-quarter truckload spot rates up 32.4% year over year excluding fuel and forecast roughly 43% growth in the third quarter. That separate forecast points to further pressure on trucking budgets despite the summer’s monthly easing.

DAT’s contract data show the transmission into budgets. New dry-van contracts were 14.4% above the rates they replaced in July. A shipper can therefore see a lower weekly spot quote while its next annual or off-cycle contract still becomes more expensive.

New contracts are resetting above the rates they replace

July 2026 · incoming contract rates versus exiting contracts

New contracts are resetting above the rates they replaceDry van truckload: New-rate differential 14.4 %; Intermodal: New-rate differential 9.3 %Dry van truckload+14.4%Intermodal+9.3%0%4%8%12%16%New contracts are resetting above the rates they replaceDry van truckload: New-rate differential 14.4 %; Intermodal: New-rate differential 9.3 %Dry van truckload+14.4%Intermodal+9.3%0%4%8%12%16%
Source: DAT iQ

Carrier exits and tighter selection limit usable trucking capacity

Several years of carrier exits, operating-cost inflation and tighter carrier selection have reduced the capacity buyers can use. JOC’s drayage reporting describes more scrutiny of safety records after the Supreme Court’s Montgomery ruling allowed the negligent-hiring claim against a broker to proceed under the federal safety exception.

The commercial effect is a narrower acceptable carrier pool in some markets. That helps explain why a shipper with flat volumes can still face higher rates: the relevant supply is the capacity its transportation providers can actually qualify and use.

Rail’s growth came mainly from domestic freight

North American intermodal volume · Q2 2026 year-over-year change

Rail’s growth came mainly from domestic freightDomestic intermodal: Volume growth 10.8 %; International intermodal: Volume growth 0.3 %Domestic intermodal+10.8%International intermodal+0.3%0%3%6%9%12%Rail’s growth came mainly from domestic freightDomestic intermodal: Volume growth 10.8 %; International intermodal: Volume growth 0.3 %Domestic intermodal+10.8%International intermodal+0.3%0%3%6%9%12%
Source: IANA via JOC

Intermodal / What the growth actually means

Higher trucking costs encourage domestic freight to move by rail

North American domestic intermodal grew 10.8% year over year in the second quarter, while international intermodal grew only 0.3% on the same IANA basis. The gap supports the industry’s account of truck-to-rail conversion rather than a comparable surge in international containers.

That shift can make rail a useful cost option for suitable inland lanes. It also increases demand for domestic containers, chassis and ramp access. The latest shipper survey reported weaker satisfaction and tender acceptance despite the cost advantage.

Union Pacific’s $1,000 California surcharge from 23 August applies to specified rail-owned EMP/UMAX domestic-container spot moves and volumes above allotment. It is not a general $1,000 addition to every ocean-container IPI shipment.

Gateway economics / China & Taiwan to Chicago

Chicago IPI rates narrow the West Coast’s price advantage

September Chicago IPI offers from China and Taiwan ranged from about $9,850–$10,500 via the West Coast and $10,700–$12,700 via the East Coast. The representative difference was about $1,500 per 40-foot, smaller than the roughly $2,600 ocean-only East Coast premium.

The West Coast still had the lower through price in this sample. But part of its ocean advantage was used by the inland move, and July’s rail dwell shows why price and delivery need to be considered together. A separate transload into domestic equipment has different costs and conditions from keeping the ocean container on an IPI move.

The same US operating issues affect cargo from India and other Asian origins, but the through prices need to be obtained for those origins. The economic choice also depends on the receiving location and whether the carrier will provide the intended inland move.

China & Taiwan → Chicago: the West Coast retains a price advantage

China & Taiwan spot ranges · USD per 40-foot · white mark shows representative level

China & Taiwan → Chicago: the West Coast retains a price advantageVia US West Coast: IPI spot rate 10178.0 $; Via US East Coast: IPI spot rate 11719.0 $Via US West Coast$9,850$10,507Via US East Coast$10,738$12,700$9k$11k$13kChina & Taiwan → Chicago: the West Coast retains a price advantageVia US West Coast: IPI spot rate 10178.0 $; Via US East Coast: IPI spot rate 11719.0 $Via US West Coast$9,850$10,507Via US East Coast$10,738$12,700$9k$11k$13k
Source: Bluspark spot rates

Our watchpoint: whether rail dwell and equipment access improve as September arrivals build. Truckload contract resets and drayage productivity can keep delivered costs high even if ocean spot rates ease.

Sources: JOC, drayage; PMSA, dwell; JOC, truckload; RXO, Q3 outlook; JOC, intermodal mix; JOC, intermodal service; JOC, UP surcharge; Supreme Court, Montgomery.

Contract repricing: DAT iQ August report, July observations. Through prices: Bluspark spot rates, 1 September.

Q4 bunker / Cost implications

Lower bunker charges are not proof of fuel-cost pass-through

Q4 brings relief on several fuel schedules, while others rise. For shippers, the issue is how much of the underlying fuel-cost change reaches the invoice.

Q4 fuel schedules include both reductions and increases

Across four reviewed fuel schedules, West Coast changes for a 40-foot dry container range from a reduction of about 15% to an increase of about 2%. East Coast changes range from a cut of about 8% to an increase of about 6%.

Schedule C falls $23 per 40-foot to West Coast North America and $41 to the East Coast. Schedule D rises $10 and $46 respectively for local port delivery; its West Coast IPI charge rises $112, or 8.2%. Schedules A and B show West Coast reductions of $152 and $75.

The dollar impact depends on the charge and shipment terms. These are changes in individual fuel components, not all-in freight prices. A lower bunker charge can be offset elsewhere in the quote.

Q4 fuel charges move in different directions across schedules

Change in stated fuel charge · 40-foot dry · Q4 versus previous level

Q4 fuel changes: reductions and increases in the same resetSchedule A: West Coast -15.0943 %, East Coast -7.1084 %; Schedule B: West Coast -9.1575 %, East Coast -7.9152 %; Schedule C: West Coast -3.8206 %, East Coast -3.7307 %; Schedule D: West Coast 1.8051 %, East Coast 5.7935 %Schedule A-15.1%-7.1%Schedule B-9.2%-7.9%Schedule C-3.8%-3.7%Schedule D+1.8%+5.8%-20%-10%0%10%Q4 fuel changes: reductions and increases in the same resetSchedule A: West Coast -15.0943 %, East Coast -7.1084 %; Schedule B: West Coast -9.1575 %, East Coast -7.9152 %; Schedule C: West Coast -3.8206 %, East Coast -3.7307 %; Schedule D: West Coast 1.8051 %, East Coast 5.7935 %Schedule A-15.1%-7.1%Schedule B-9.2%-7.9%Schedule C-3.8%-3.7%Schedule D+1.8%+5.8%-20%-10%0%10%
West CoastEast Coast
Source: Carrier fuel notices

A 3.8% surcharge cut sits between two different fuel-cost declines

Schedule C · Q4 versus Q3 fuel references and charges

A 3.8% fee reduction sits between the two fuel-input changesVLSFO reference: Q4 versus Q3 basis -2.8994 %; LSMGO reference: Q4 versus Q3 basis -8.6123 %; West Coast fee: Q4 versus Q3 basis -3.8206 %; East Coast fee: Q4 versus Q3 basis -3.7307 %VLSFO reference-2.9%LSMGO reference-8.6%West Coast fee-3.8%East Coast fee-3.7%-10%-5%0%A 3.8% fee reduction sits between the two fuel-input changesVLSFO reference: Q4 versus Q3 basis -2.8994 %; LSMGO reference: Q4 versus Q3 basis -8.6123 %; West Coast fee: Q4 versus Q3 basis -3.8206 %; East Coast fee: Q4 versus Q3 basis -3.7307 %VLSFO reference-2.9%LSMGO reference-8.6%West Coast fee-3.8%East Coast fee-3.7%-10%-5%0%
Source: Carrier fuel notices

The surcharge fell, but the cost relationship is not transparent

In schedule C, the West Coast surcharge falls 3.8%. Over the matching reference periods, very low sulfur fuel oil (VLSFO) falls 2.9% and low sulfur marine gas oil (LSMGO) falls 8.6%. The surcharge reduction sits between those two fuel-price changes.

That is not enough to establish a straight pass-through of fuel costs. The result depends on the fuel mix and calculation weights. Without those weights, the comparison cannot establish either full pass-through or retained savings. The reduction provides budget relief, but does not confirm that the charge matches the underlying cost.

For Q4 budgets, apply the actual dollar change to the relevant charge and equipment. For procurement discussions, ask how the surcharge reconciles to its fuel-cost basis.

The fuel actually burned matters as much as the index

In Singapore, the VLSFO benchmark was $855 per tonne on 3 September, compared with $651.50 for IFO380. Houston's gap was $217 per tonne; Rotterdam's was $119.50. Those differences are large enough to matter when a charge uses one fuel basis and the ship's actual fuel mix differs.

Ships with approved exhaust-cleaning systems can use high-sulfur fuel while meeting sulfur rules. The lower fuel price is not all profit: equipment and operating costs also matter. But a surcharge tied to a low-sulfur benchmark does not, on its own, establish the ship's fuel cost.

Our cost analysis connects three things: the fuel purchased, the quantity burned over the voyage, and the allocation across laden cargo. Vessel design, speed and routing affect consumption. Loading and the division of cost between directions affect the amount assigned to each container.

The fuel-grade price gap runs from $120 to $217 per tonne

Spot fuel benchmarks · 3 September 2026 · USD per tonne

The fuel-grade price gap runs from $120 to $217 per tonneSingapore: IFO380 651.5 $/t, VLSFO 855 $/t; Houston: IFO380 505.5 $/t, VLSFO 722.5 $/t; Rotterdam: IFO380 568 $/t, VLSFO 687.5 $/tSingapore$651.5$855Houston$505.5$722.5Rotterdam$568$687.5450600750900The fuel-grade price gap runs from $120 to $217 per tonneSingapore: IFO380 651.5 $/t, VLSFO 855 $/t; Houston: IFO380 505.5 $/t, VLSFO 722.5 $/t; Rotterdam: IFO380 568 $/t, VLSFO 687.5 $/tSingapore$651.5$855Houston$505.5$722.5Rotterdam$568$687.5450600750900
IFO380VLSFO
Source: Bunker Index

August fuel prices turned upward despite the Q4 relief

Singapore's average VLSFO price rose from $751.50 in July to $825 in August, an increase of 9.8%. Houston rose 4.5% and Rotterdam 2.8%. These monthly movements cover a different window from the quarterly references above. They show why a lower announced Q4 charge should not be read as evidence that fuel is still getting cheaper.

Perspective

Test the level of the charge, not just its quarterly change

A surcharge can fall in line with an index and still sit above the cost allocated to the shipment. The useful procurement question is whether the starting level and the adjustment both reconcile to fuel cost. Accepting a modest reduction without examining that starting point leaves the larger question unanswered.

Sources: Bunker Index; IMO.

Closing thoughts

John Westwood
John WestwoodDirector, Bluspark

The next turning point depends on cargo clearing the system.

The stronger September arrival forecast buys the market time; the softer Q4 outlook puts a limit on how far that argument can run. If origin backlogs clear while scheduled West Coast capacity arrives as planned, pressure on departures should ease. If carriers then remove sailings, space may remain uneven despite slower purchasing.

Three developments would change our assessment: restored loading calls in China, more repeatable Panama passages, and shorter container cycles through terminals and inland equipment. For subcontinent cargo, resumed empty movements at Mundra and accepted onward bookings are the nearer tests. Those changes would turn a forecast of relief into a more workable shipping plan.

BluVoyix Intelligence

Want more insight into your freight?

See what the rate alone can’t tell you

BluVoyix Intelligence connects the market picture to your freight: which services perform, what delays cost and whether your carrier choices still make sense.

Bluspark combines the analysis with advisory support through the bid and the contract year. Compare service options, assess bids beyond the ocean rate, and track whether the service you awarded is delivering.

Know the options on your lane

Compare transit, reliability, capacity and service choices.

See the cost beyond the rate

Bring delay, inventory and landside costs into the bid comparison.

Track what changes after award

Follow performance against the award and the market.